Email Us

Maintenance Items and Frequency Chart for Dryer

The maintenance of composite machinery is the prerequisite to ensure the smooth implementation of composite process requirements. 


The Maintenance Items and Their Frequency for the Dry Laminating Machine


Power Unit


  • Main motor current value inspection: Daily


  • Confirmation of main motor cooling ventilation: Daily


  • Transmission belt tension aging inspection: Daily


Transmission Unit


  • Inspection of oil in each gearbox: Weekly


  • Refilling and replacing oil in each gearbox: Every six months


Pressure Adjustment Air System


  • Inspection of compressor intake and filters: Monthly


  • Inspection of piping and air leaks: Every six months


  • Confirmation of pressure gauges in each department: Daily


  • Exhausting air filters in each part: As needed


  • Inspection of filter materials in each air filter: Monthly


  • Refilling oil in each oil-water separator: Weekly


  • Inspection of each oil-water separator: As needed


Cooling System


  • Confirmation of water status in each part: Daily


  • Inspection for leaks in piping: Quarterly


  • Inspection of rotating joints in each part: Monthly


Feeding and Reeling System


  • Confirmation of cooling water in powder brakes: Daily


  • Inspection of powder condition in powder brakes and powder synthesizers: Quarterly


  • Inspection of gears: Annually


Coating System


  • Cleaning of adhesive tray: Daily


  • Cleaning of adhesive tank: Daily


  • Cleaning and oiling of adhesive tray: Daily


  • Inspection of adhesive hoses: Daily


Drying Section


  • Cleaning of impurities and powder in the drying channel: Daily


  • Checking for looseness in ventilation ducts: Weekly


  • Inspection of fan belt aging: Monthly


  • Inspection of all parts: Monthly


Others


  • Refilling oil for oil holes in each part: Daily


  • Refilling grease for grease holes in each part: Weekly


  • Cleaning debris and dust in each part: Monthly


  • Cleaning glue in each part: Monthly


  • Inspection and tightening of loose screws and nuts in each part: Monthly


  • Cleaning the interior surface of the control panel: Every 3 months


By following the above maintenance items and frequencies, the normal operation of the dry laminating machine and its performance can be effectively ensured.

Related EAS & RFID Products

Products
High-quality EAS Security & RFID Products for you! Whenever and whatever you need, we can provide the best solution for our customers.
To Know Novatron More
Address
No.27, Futai Rd., Zhongtai Industrial Area, Yuhang District, Hangzhou City, Zhejiang Province 311121, China